Vestas – Red Lily Wind Farm

Project Description

The project includes foundations and erection of 16 – 1.65 MW Vestas V82 turbines, each located on a separate access road.

Red Lily utilizes a combination of traditional spread footings which are 60 feet wide and 12 feet deep and unique PAHT foundations with concrete and anchor bolts located between inner and outer corrugated metal pipes. The PAHT foundations have a diameter of approximately 14 feet and a depth of 32 feet.

The duration of this project was four months.