Nissan Paint Shop Mezzanines

Project Description

Aristeo fabricated and installed all the mezzanine and walkway steel for the new paint addition. The mezzanines and walkways are for supporting and maintaining the air supply houses, strip out conveyors and pretreatment tanks and conveyors.

Close coordination is required with the other trades as there are only 8’-0 aisles and all trades have to be in same area at the same time. Daily meetings are conducted to ensure the smooth flow of work and to maintain the aggressive two month schedule.